Finally getting close to my roof replacement (Aug original hail damage found, October materials ordered).
9 pallets of materials were finally delivered last Wed (original plan of roof work on thurs and fri of that week) but was pushed back a week due to other jobs delayed (weather).
Anyway took inventory of the material delivered and compared it to the insurance estimate, a couple items I noticed:
- Less material (delivered ~ 7% waste-shingles vs 10% waste paid for by insurance)…which is not relevant.
- There was no turtle/box vents (I have 2- I think used for bathroom exhaust) or exhaust vent flashing for my b-vent pipe (gas hot water heater and gas furnace) but there were 2 cans of black spray paint.
I know it is common for the roofers to paint the plumbing vent pipes and flashing, however it is common for them to reuse the vents/flashing even though it is listed on the insurance estimate as a replacement item and just paint the old one. Which is fine if they can be reused.