Dumpster size


#1

what’s the proper size can for say 40 or 41 square tear off(2 layers), and the scrap from sheathing and install? thanks, greg


#2

20 yard which will be very full (probably 30 if you can find one in your area)


#3

30 yd


#4

i hate doing shake reroofs due to the fact you need the big ass dumbsters and most time two of em.


#5

Ask what the ton limit is on your dumpster. I have 5 ton limits with the new company I am with but last year I only had a 3 ton limit and there was a lot of overage charges so keep that in mind also in choosing a dumpster. I had a 33 square shake tear off and re-sheet and the front porch was re-framed and I almost filled up 2 20 YD dumpsters so keep that in mind.


#6

We just tore off 41 sq of new shingles with 2 layers of roll roof underneath. We filled a 30 yarder and had a total of 13.73 tons.